BIM Services
⭐ BIM 3D Modeling (LOD 100–500)
We create detailed, data-rich 3D models used for design, visualization, coordination, and construction.
Includes:
Landscape grading, hardscape, softscape, irrigation
Infrastructure: roads, utilities, drainage
Architectural, Structural & MEP model integration
GRP panels, landscape structures
Real materials & scheduling data embedded
Outcome: A complete digital representation of the project.







⭐ BIM Coordination & Clash Detection
We integrate all discipline models into a federated BIM model and detect clashes before construction begins.
Process:
Clash detection using Navisworks + Revit
Issue identification with screenshots
Coordination meetings with stakeholders
Clash resolution & updated models
Outcome: Zero rework, zero conflict on site.






⭐ Construction Documentation
Drawings extracted directly from BIM ensure maximum accuracy.
We deliver:
GA drawings
Hardscape & softscape drawings
Irrigation layout, zoning, and sections
GRP installation drawings
Elevations, sections, details
Material schedules
Outcome: Construction-ready documentation with high precision.




⭐ Quantity Take-Off (QTO) & BOQ
We generate real-time quantities linked to the model.
QTO for:
Paving, kerbs, concrete, subbase
Irrigation pipes, valves, fittings
Planting counts and sizes
GRP elements
Utilities and infrastructure items
Outcome: Accurate budgeting, procurement & tendering.




⭐ Revit Family & Content Creation
We develop lightweight, parametric Revit families tailored to project standards.
We create:
Furniture, bollards, bins
Irrigation components
Hardscape elements
Tree & shrub families
Landscape accessories
Outcome: Faster modeling, consistent outputs, and better scheduling.




⭐ Landscape & Infrastructure BIM
A specialized service prepared for contractor-level detailing.
Landscape BIM includes:
Grading & contour modeling
Planting BIM with botanical data
Irrigation BIM (pressure zones, controllers)
Water features, pergolas & structures
Infrastructure BIM includes:
Roads & pathways
Stormwater & drainage
Streetlighting & utilities
Manholes & chamber modeling
Outcome: Complete outdoor digital environment modeling.


⭐ 4D BIM – Construction Sequencing
We link model elements to the project schedule and create time-based simulations.
Outcome: Better planning, phasing clarity, and faster decision-making


⭐ 5D BIM – Cost Integration
Cost data is connected to model elements for real-time budget analysis.
Outcome: Transparent cost control and material management.




⭐ As-Built / Scan-to-BIM Modeling
We convert site data, redlines, and scans into accurate as-built BIM models.
Outcome: Perfect for facility management and future renovations.






⭐ BIM Standards, BEP & Templates
1️⃣ BIM Standards
We develop a complete BIM standard system that defines how every model and drawing must be structured.
What Our Standards Include:
Naming conventions for files, models, views, sheets (ISO 19650 compliant)
Modeling rules for geometry, LOD, categories, and worksets
Level, grid, and coordinate setup guidelines
Annotation standards (dimensions, tags, text, line styles)
Material and object classification
Modeling accuracy and tolerance guidelines
Color coding and graphic presentation rules
Standard workflows for linking models and referencing CAD files
Why This Matters:
✔ Smooth coordination
✔ Less rework
✔ Clean, consistent deliverables
✔ Faster model reviews and approvals
2️⃣ BIM Execution Plan (BEP)
We prepare both pre-contract and post-contract BEPs that define how BIM will be delivered for the project.
Our BEP Covers:
Project Information & Roles
BIM responsibilities
Communication process
Project deliverable strategy
BIM Goals & Uses
3D modeling
Clash detection
QTO / BOQ
4D & 5D BIM
As-built modeling
Model Development Strategy
LOD requirements per stage
Model splitting & worksharing
File formats and submission protocols
Coordination Workflow
Clash detection process
Issue resolution procedure
Federation model strategy
Coordination meeting schedules
Information Management
CDE (Common Data Environment) setup
File naming and revision codes
Drawing and model submission standards
Quality Control
Model audits
Drawing QC
Compliance tracking
Benefits:
✔ Clear communication
✔ Predictable delivery
✔ Transparent coordination
✔ Consistent documentation
3️⃣ Revit Template (RTE) Development
We create custom Revit templates that help teams start projects faster and follow consistent standards.
Our Templates Include:
Predefined sheets and title blocks
Standard text, dimensions, and tag styles
View templates and browser organization
Preloaded families (landscape, irrigation, hardscape, utilities)
Material libraries & object styles
Ready-made legends & schedules
Worksets for each discipline
Benefits:
✔ Faster project setup
✔ Higher model quality
✔ Reduced errors
✔ Consistent outputs across projects
4️⃣ Model Auditing & QA/QC
We perform detailed audits to ensure models follow standards, BEP requirements, and ISO protocols.
We Check:
Naming & worksets
LOD accuracy
Level & coordinate setup
Unused or corrupted families
Over-modeling / under-modeling
Annotation and sheet standards
Clash-free and coordination readiness
Deliverables:
Audit report
Issues list
Correction recommendations
Compliance confirmation
5️⃣ ISO 19650 Implementation
We help organizations fully adopt ISO 19650 workflows.
Includes:
CDE folder structure
Status & suitability codes
Information delivery milestones
File naming and revision control
EIR (Exchange Information Requirements) alignment
Asset information delivery for FM
Benefits:
✔ Global standards compliance
✔ Efficient information exchange
✔ Clear approval routes
✔ Reliable project documentation
⭐ Why This Service Matters
Ensures high project accuracy
Reduces errors, rework, and delays
Improves coordination between all stakeholders
Supports faster approvals and submissions
Guarantees clean, consistent BIM models
Strengthens client confidence and project delivery
At Constronivarna, we create ISO 19650–compliant BIM Standards, Execution Plans, and Revit Templates that ensure every project is delivered with consistency, accuracy, and clarity.
Our standards guide how models, drawings, files, and information are created, coordinated, exchanged, and maintained throughout the project life cycle.
Why Constronivarna?
1️⃣ Contractor-Side BIM Expertise
We understand real construction challenges.
Our models and drawings are developed to match site conditions, sequencing, and buildability—not just design intent.
2️⃣ Specialists in Landscape & Infrastructure BIM
Most BIM firms focus only on buildings.
Constronivarna is unique with deep expertise in landscape, infrastructure, utilities, irrigation, and outdoor environments, offering unmatched precision.
3️⃣ High-Accuracy, Construction-Ready Models
Every model and drawing we deliver is:
✔ ISO-compliant
✔ Fully coordinated
✔ Extracted directly from BIM
✔ Suitable for construction, fabrication & site execution
4️⃣ Fast Turnaround & Reliable Delivery
We understand project deadlines.
Our workflows are optimized for quick delivery without compromising quality, supporting contractors during peak project phases.
5️⃣ Advanced BIM Tools & ISO 19650 Standards
We follow global standards:
ISO 19650
BEP-based workflows
Standard naming, coding & QA/QC
Ensures consistency and smooth handover.
6️⃣ Zero-Rework Coordination
We run full coordination cycles across Architectural, Structural, MEP, Landscape, and Infrastructure models.
Our clash-free models significantly reduce site conflicts, delays, and cost overruns.
7️⃣ 11+ Years UAE Project Experience
Strong track record delivering BIM solutions for:
Developers
Consultants
Contractors
Government projects
Trusted experience across the UAE market.
8️⃣ Tailored Solutions for Every Client
We adapt BIM workflows based on client needs:
✔ Design development
✔ Tender documentation
✔ Contractor BIM
✔ As-built BIM
✔ Facility management integration
9️⃣ Best Value for Money
You get top-quality BIM deliverables with affordable pricing suitable for start-ups, contractors, and large-scale clients.
🔟 Full Support from Start to Finish
We stay with the client through the entire project lifecycle:
Kick-off
Modeling
Coordination
Shop drawings
As-built
Handover
Your success is our priority.
Contact Us
Reach out to constronivarna for tailored BIM solutions.
Contact
Reach us for BIM solutions anytime
Phone
info@constronivarna.com
UAE: +971 58 833 0899
© 2020. All rights reserved.